A great working weekend at barnhouse. We painted the everything. Living room has the lower portion of walls done, ceiling done, and trim rings installed on potlights. We may need a second coat of "renter's brown" on the walls, and we need to do the top portion of the walls. In between we're putting up plate rail. That has to wait for new windows (to order this week).
Upstairs, the bathroom is done minus the floor and reinstalling fixtures. I am a little up in the air on the vanity and may bring in a unit from Ikea that I saw a week ago and looks way better than the old one. Next weekend I'll take up a bucket of levelling compound and get the floor in, then worry about the fixtures the following week.
In the master bedroom, the ceiling is all primed and painted and after feeling how soft the plaster on an end wall was, I installed drywall over it. Next weekend we will sand and skim coat the drywall, then hopefully prime it on Sunday.
Over the past week, plumbers came by and hooked up the drains, but we are still on a temp feed for water and no meter hooked up. We really need resolution to the whole water/plumbing situation soon.
We need to paint the ceilings upstairs (all of them) and come to a resolution on WTF we're doing with the kitchen/dining room. Whatever we choose, there will be marital discord.
Those who have been through (R@63, CannotWait) do you remember the kitchen? What are your thoughts? IMO we at least need to find a way to get a microwave and dishwasher in.