This thread has gotten rather spread out and convoluted. In an attempt to summarize the timeframe, here is a synopsis of events:
Tesla solar:
12/04/2022: Paid $250 deposit to request Tesla solar.
01/06/2023: On-site inspection.
01/25/2023: System redesign posted based on inspection.
02/05/2023: 2nd Re-design posted based on my request.
02/05/2023: Order placed for Tesla solar.
02/22/2023: Cancelled Tesla solar order.
Bright Eyes Solar:
03/16/2023: Paid $2,000 deposit to move forward with solar from local company. Was given a 4 month estimate for completion.
06/08/2023: Notified that all permits are approved and installation will move forward as soon as 2/3 payment is received.
06/13/2023: Payment mailed
06/24/2023: Interior electrical work completed i.e. tied in to panel and equipment installed near meter.
Remainder of install scheduled for M-W 6/26-6/28
10.53kW for $29,962 gross, $9138 federal rebate:
$20,824 net cost.
12.78 MW annual production estimate, net metering, ~$500/year SREC's.
1,134 kW average monthly consumption for past 11 months, or 13.6 MW/year
Solaria 390X panels; 25 year manufacturer power, parts, labor warranty.
Enphase micro-inverters; 25 year manufacturer warranty
Installer: 10 year warranty.