Almost all the walls are painted. Where the stairway from the first floor to the basement goes down, that wall is essentially two stories and I have the top story textured and painted but don't have the lower part. Before I do that, I wanted to remove the stair railings so that I can shoot it easier with the texture hopper gun and before I did that, I wanted to figure out what I am going to do with the railings. They are old, broken and very out of style so I want to rebuild them from scratch. But I don't want to leave the stairway open for very long. So once I have the new railings figured out, I will remove the old, shoot the remaining wall with texture, paint, put up the new railing and then start flooring.
I am attaching a couple pictures. The first is of our new chandelier that I got hung up in the dining room so we can eat to something other than a bare bulb. The second is of the second layer of subfloor going in. The first layer original to the house, was nailed without adhesive and squeaks and curled up around the corners making it uneven to walk on. The second layer which I am screwing down to the joists through the first layer takes care of all those problems. It is now installed so once I figure out what I am going to do with the stair railings, I can lay the rest of the tongue and groove hardwood flooring.